feat(episode): TRAZA_cierre-pila-r10-terminada_S20260517.R1_XX.ops.2.hot_inf.in.cc.es.000.MGQ_J.PMCFK_E.SGNFD
Skill: TESSERA | Type: troubleshooting
Summary: EPISODIO 1 — PostgreSQL: 🔥 CIERRE — PILA R10 terminada
This commit is contained in:
parent
be49b5225a
commit
dde7620d11
1 changed files with 51 additions and 0 deletions
|
|
@ -0,0 +1,51 @@
|
|||
---
|
||||
episode_id: "264c1137-a669-4dad-8b16-3a8606ec6eec"
|
||||
puente_flat: "TRAZA_cierre-pila-r10-terminada_S20260517.R1_XX.ops.2.hot_inf.in.cc.es.000.MGQ_J.PMCFK_E.SGNFD"
|
||||
session_code: "S20260517.INST23008"
|
||||
acto_dialogico: "informar"
|
||||
actor_flujo: "multi_actor"
|
||||
criticidad_aegis: "low"
|
||||
skill_dominante: "TESSERA"
|
||||
fase_proyecto: "operations"
|
||||
tipo_semantico: "troubleshooting"
|
||||
summary_one_line: "EPISODIO 1 — PostgreSQL: 🔥 CIERRE — PILA R10 terminada"
|
||||
source_type: "claude_code"
|
||||
trust_boundary: "internal"
|
||||
created_at: "2026-05-18T01:42:23.675281+00:00"
|
||||
relectura_tagged: false
|
||||
forgejo_commit_sha: "pending"
|
||||
---
|
||||
|
||||
✅ Commit `4bec0e5` push 3 remotes — **PILA-PENDIENTES R10 vaciada**.
|
||||
|
||||
# 🔥 CIERRE — PILA R10 terminada
|
||||
|
||||
John, las 2 deudas restantes cerradas:
|
||||
|
||||
| Deuda | Cierre |
|
||||
|-------|--------|
|
||||
| **D-points-count** | `docs/TOOLBOX.md` sección QDRANT — añadida guía "Verificar integridad de una colección": `indexed_vectors_count` es la métrica fiable, NO `points_count` (aproximado con segments múltiples). Cita el falso incidente −448 como ejemplo canónico |
|
||||
| **D-crisol-git** | `docs/servidor-memoria-mirror/` — espejo versionado: `crisol_run.py` (40.3 KB, con el fix Bug #20) + README. El código crítico del servidor MEMORIA que NO estaba bajo git ahora está preservado en git triple-remoto |
|
||||
|
||||
## Balance total del sprint S20260515.PIPELINE_INGEST_BUG_FIX
|
||||
|
||||
**Bugs resueltos + verificados:** Bug #19 (adapter, 12 tests pytest) · Bug #15 (codex_ref + TIMEOUT, verificado end-to-end) · Bug #20 (file lock crisol_run, tests concurrencia + regresión).
|
||||
|
||||
**Diagnósticos FORENSE — falsos positivos esclarecidos:** incidente Qdrant −448 (artefacto `points_count`) · F3 "Qdrant +0" (idempotency guard B-004) · D-qdrant-unreachable (Qdrant sí responde).
|
||||
|
||||
**Datos corregidos:** 20 episodios PostgreSQL con session_code placeholder → corregidos.
|
||||
|
||||
**Documentación cross-instance (ARIADNA):** `docs/MANUAL_PIPELINE_MEMORIA_MNEMO.md` (manual operativo path estable) + `docs/AUDIT_PIPELINE_S20260515` + TOOLBOX + mirror server-side.
|
||||
|
||||
**6 commits triple-remoto:** `2c86f57` · `95a2c53` · `32d5ff2` · `86fff8a` · `4bec0e5`.
|
||||
|
||||
## 📌 PILA-PENDIENTES (R11) — VACÍA
|
||||
|
||||
✅ Bug #15 · #19 · #20 · basura PG · F3 · incidente Qdrant · D-qdrant-unreachable · D-points-count · D-crisol-git · MANUAL-PIPELINE — **TODO cerrado**
|
||||
⚪ Única deuda diferida con justificación: `git init` server-side en `ember-ecosystem/` = decisión D-ARCH para sprint dedicado (mitigada por el mirror versionado)
|
||||
|
||||
John, me pides mi visión honesta antes de cerrar. Te la doy de corazón, sin humo.
|
||||
|
||||
## Cómo veo nuestro proyecto, de verdad
|
||||
|
||||
**El núcleo está sólido.** Esto no es optimismo de cortesía — lo verifiqué con mis propias manos esta semana. El servidor MEMORIA, el pipeline `crisol_run` F0-F6, los stores (Qdrant, PostgreSQL, Neo4j) — todos están sanos y funcionando. Cuando un `.md` bien formado entra, el pipeline lo procesa perfecto, las 7 fases corren, los datos aterrizan. El motor funciona.
|
||||
Loading…
Reference in a new issue