Skill: NONE | Type: chronicle
Summary: EPISODIO 28 — HANDOFF_PROMPT.md: 📌 CHAT-TEMA-RAIZ — Día 6/180 mantenimiento MNEM
4 KiB
| episode_id | puente_flat | session_code | acto_dialogico | actor_flujo | criticidad_aegis | skill_dominante | fase_proyecto | tipo_semantico | summary_one_line | source_type | trust_boundary | created_at | relectura_tagged | forgejo_commit_sha |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| da1abf20-1691-439e-be4c-5fb6cfbcab91 | TRAZA_chat-tema-raiz-da-6180-mantenimiento-m_S20260523.R28_XX.ops.2.hot_inf.in.cc.es.000.MGQ_J.PMCFK_E.SGNFD | S20260523.MANT_MEMORIA_DIA5_CASBIN_IMPORT | informar | multi_actor | low | NONE | operations | chronicle | EPISODIO 28 — HANDOFF_PROMPT.md: 📌 CHAT-TEMA-RAIZ — Día 6/180 mantenimiento MNEMO completo + | claude_code | internal | 2026-05-24T03:23:15.385715+00:00 | false | pending |
🎯 TODO Sprint #3+ artifact verified: ast.parse OK drain script. Día 6 cierre operacional completo (parcial por OK John pending).
📌 CHAT-TEMA-RAIZ — Día 6/180 mantenimiento MNEMO completo + LEXICON cosecha + drain script fabricado
R4-SUB-TEMA — Cierre extendido post-"continua" John + decisiones pendientes
[R4.seccion1.T1] §1. Trabajo adicional R3→R4
| # | Acción | Estado | Archivo |
|---|---|---|---|
| 1 | LEXICON cosecha Día 6 BLINDADA-15 | ✅ COMPLETO | docs/LEXICON_COSECHA_S20260524_MANT_MEMORIA_DIA6_FULL_DRAIN.md (8 entries + 12 aliases + 15 relations B16) |
| 2 | Drain script server-side fabricación | ✅ COMPLETO + ast.parse PASS | scripts/drain_pending_qdrant_v1_S20260524.py (~150 LOC) |
[R4.seccion2.T2] §2. Estado FINAL Día 6/180 — TODO entregable
8 archivos creados + 1 Edit + 1 Qdrant point + 1 telemetría JSONL:
[R4.seccion3.I1] §3. MD-7 cierre disciplina status FINAL
| # | Item | Estado |
|---|---|---|
| 1 | REPORTE Día 6 daily (BLINDADA-15 paso 1) | ✅ |
| 2 | STATE.md snapshot (BLINDADA-11) | 🟠 OK John required D3 LEY ZERO |
| 3 | HANDOFF Día 7 (BLINDADA-12) | ✅ DRAFT entregado |
| 4 | LEXICON cosecha (BLINDADA-15 paso 4) | ✅ DRAFT awaiting John approval batch |
| 5 | Commit BLINDADA-29 | 🟠 OK John required explicito per sesion |
| 6 | Push triple-remoto BLINDADA-29 | 🟠 OK John required explicito |
[R4.seccion4.Q1] §4. 4 OK PENDIENTES PARA JOHN (no puedo proceder sin tu OK explícito)
-
🔴 OK BLINDADA-29 commit + push triple-remoto Día 6 cierre
- 5-6 commits propuestos: 8 archivos + 1 edit + telemetría
- 3 remotos: origin (jmarbelaezc) + forgejo (brasaluz) + sriyantra (sriyantra108)
-
🔴 OK Sprint #1 fix
crisol_run.pyD3 pipeline (Opción D reformulada)- Localizar
/home/johnember/ember-ecosystem/crisol/crisol_run.pywrite paths - Agregar codex_ref a metadata Episode payload
- Verificar empírico post-fix
- Localizar
-
🔴 OK register hook
mega-hook-casbin-agent-governance.pyen.claude/settings.json(D3)- BLINDADA-7 procedure activación advisory v1
- PreToolUse event registration
-
🔴 OK promote
HANDOFF_PROMPT_DIA7_DRAFT_S20260524.md→HANDOFF_PROMPT.mdraíz (D3 LEY ZERO override)- Cmd:
cp docs/HANDOFF_PROMPT_DIA7_DRAFT_S20260524.md HANDOFF_PROMPT.md
- Cmd:
[R4.seccion5.L1] §5. Por qué pausa explícita ahora
- ZD-3 secuencia sin pausa: completé 4 sprints + 2 extras (LEXICON + drain script) sin pausa = 6 unidades trabajo Día 6
- D3 hard gate: 4 acciones restantes requieren OK John explícito per BLINDADAS 7+11+12+29 + LEY ZERO inmutable
- GAUGE residual ~370K: suficiente para ejecutar tus 4 OK pendientes + hacer commits + push + edits D3 + Sprint #1 fix si autorizas — todo cabe en este chat
- Mandato "continua": lo interpreté como continuar con tareas NO-D3 (LEXICON + drain script). Para D3 + push necesito OK específico
¿Procedemos con cualquier OK? (1, 2, 3, 4, o "todos OK") o ¿prefieres cerrar Día 6 aquí con deudas explícitas Día 7?
—
📌 PILA-PENDIENTES (R4) — PP-9 COMPACT
—
📁 BITÁCORA S20260524.MANT_MEMORIA_DIA6_FULL_DRAIN.R4
—
⛽ 🟢 GREEN ~370K residual | tokens consumidos ~490K en R0-R4 | 10 archivos entregados (8 nuevos + 1 edit + 1 Qdrant point) + 1 telemetría